解讀環(huán)氧地坪漆施工前為什么需要打磨地面?
環(huán)氧地坪漆在施工前首先要確認(rèn)地面情況,如果地面凹凸不平,有舊油漆,存在疏松層等,就直接影響環(huán)氧地坪整體的施工效果,所以要先將地面充分磨平、棉掉,這樣可以減少用漆量,增加附著力,使漆膜不易破壞,并使整體效果看上去更平整、美觀。環(huán)氧樹(shù)脂地坪漆施工前打磨地面對(duì)新建水泥環(huán)氧地坪上面的水泥塊,灰粉起到很好的去除作用,能有效地打開(kāi)水泥毛孔,以便環(huán)氧樹(shù)脂底漆更好地滲透滲出與吸收,環(huán)氧地坪漆工程的質(zhì)量起到至關(guān)重要的作用。
Before the construction of epoxy floor paint, first of all, we should confirm the ground condition. If the ground is uneven, there are old paints and loose layers, it will directly affect the construction effect of the whole epoxy floor, so we should first grind the ground fully and remove cotton, so as to reduce the amount of paint used, increase the adhesion, make the film not easy to damage and rectify. The body effect looks smoother and more beautiful. Before the construction of epoxy resin floor paint, polishing the ground has a good effect on removing the cement blocks and powders on the new cement floor. It can effectively open the cement pore, so that the epoxy resin primer can penetrate and absorb better. The quality of the epoxy floor paint project plays a vital role.
所以用專(zhuān)用研磨機(jī)對(duì)水泥或混凝土地面進(jìn)行打磨尤其重要,以去除其表面的浮漿層,并使基層表面達(dá)到要求的粗糙度即可。目的是增強(qiáng)涂層材料與基層的粘結(jié)力。具體打磨厚度沒(méi)有要求,看基層的原先質(zhì)量。
Therefore, it is particularly important to use a special grinder to grind the cement or concrete floor to remove the slurry layer on the surface and make the base surface meet the required roughness. The purpose is to enhance the bonding force between the coating material and the substrate. Specific grinding thickness is not required, depending on the original quality of the grass-roots.
水泥基礎(chǔ)地面打磨
Ground grinding of cement foundation
水泥地面做環(huán)氧樹(shù)脂地坪漆有如下要求:
Cement floors for epoxy floor paint have the following requirements:
1.水泥基面牢固、結(jié)實(shí)、不起殼,杜絕砂漿起殼現(xiàn)象,最好混凝土層與砂漿找平層一起澆注;如果先搗混凝土層,則要求砂漿層的厚度不低于4cm,叉車(chē)道則要求更厚一些。
1. Cement base surface is firm, firm and can't afford shelling. It's better to pour the concrete layer together with the mortar leveling layer. If the concrete layer is tampered first, the thickness of the mortar layer is not less than 4cm, and the forklift lane is thicker.
2.要求表面不起砂,硬度好,沒(méi)有水泥粉化現(xiàn)象。要求A、優(yōu)質(zhì)水泥。B、新倒水泥砂漿層要充分保養(yǎng)
2. Require no sand on the surface, good hardness and no cement pulverization. Requirements A, high quality cement. B. Full maintenance of newly poured cement mortar layer
3.水泥基面平坦、無(wú)凸凹不平、蜂窩麻面、水泥疙瘩。
3. The cement base surface is flat, without bumps, honeycomb linen surface and cement keloid.
4.要求地面平整性不大于涂裝要求厚度(用3 米直尺平靠);
4. Require that the surface flatness should not be greater than the required coating thickness (with 3 meters ruler flat);
5.表面干燥,含水量小于6,保持地面干燥無(wú)油污,切記水泥地面保養(yǎng)期過(guò)后進(jìn)場(chǎng)施工前5天,不能用水沖洗或拖把拖地.
5. The surface is dry and the water content is less than 6. Keep the ground dry and free of oil pollution. Keep in mind that after the maintenance period of the cement ground, you should not wash or mop the ground with water five days before entering the construction site.
6.環(huán)氧地坪表面的PH值應(yīng)在6.0~8.0
6. The PH value of the floor surface should be between 6.0 and 8.0.
7.地面無(wú)油污、其他油漆、乳膠漆、泡泡糖等殘?jiān)?
7. There is no oil stain, other paint, latex paint, bubble sugar and other residues on the ground.
8.坡度應(yīng)符合設(shè)計(jì)要求,允許偏差值為坡度的2%,并且不大于30mm。
8. The gradient should meet the design requirements. The allowable deviation value is 2% of the gradient, and it is not more than 30 mm.
評(píng)論
-
管理員剛剛
暫無(wú)任何留言!
聯(lián)系我們
Contact Us
- 無(wú)錫龍鼎地坪科技有限公司
- 電 話:0510-88585862
- 聯(lián)系人:范經(jīng)理
- 手 機(jī):139-2116-5688
- 郵 箱:wxlddp@126.com
- 地 址:無(wú)錫市新區(qū)梅村工業(yè)園區(qū)